Answer

Feb 24, 2025 - 04:00 AM
To install the LinmoreLED Essential Series fixtures, follow these steps:
1. Consult a local licensed electrician or electrical contractor before starting the installation.
2. Review all the warnings and instructions provided in the installation guide.
3. Inspect the packaging for any signs of damage. If the packaging is damaged, notify the carrier immediately.
4. Unpack the fixtures from the packaging and properly dispose of the packaging materials.
5. Inspect the fixtures for any damage. If any damage is observed, take photographs and contact warranty@linmoreled.com.
6. Turn off the electricity at the main circuit breaker, panelboard, fuse box, or disconnect before attempting to install the fixture.
7. Ensure that the location where the fixture will be installed is properly rated to support the weight of the fixture.
8. Mount the fixture according to the specific installation method provided in the guide (Cable Ready Mount, Surface Mount, Rigid Stem Mounting, Hook and Loop, Plate Mount, or Hanger Mount).
9. Make the final electrical connections inside the wireway, following all applicable codes and regulations.
10. Close the wireway cover and insert the safety xxxx provided.
11. Turn on the electricity at the circuit breaker, panelboard, or fuse box to test the fixture. If the fixture does not illuminate, refer to the troubleshooting instructions or contact technical support.
Please note that this is a general overview of the installation process. For more detailed instructions and specific information for your fixture model, refer to the LinmoreLED Essential Series Installation Guide or contact LinmoreLED directly.
Add New Comment