Answer

Feb 24, 2025 - 03:30 AM
To install the pump hose on the RUNZE FLUID RZ1030B Peristaltic Pump, follow these steps:
1. Open the spring lock located on the pump head.
2. Open the upper-pressure block.
3. Install the pump hose, ensuring that the fittings on the two ends of the hose are stuck to the pump head.
4. Close the upper-pressure block.
5. The installation is now complete.
It is also recommended to grease the hose with a certain amount of grease to prolong its service life.
For more detailed information and illustrations, please refer to the instruction manual provided by RUNZE FLUID.
Add New Comment