Answer

Feb 23, 2025 - 09:32 PM
Installation of the Premier Copper Products HV-EURO38S-NB-C2036BP1-TWSB Hammered Copper Wall Mounted Euro Range Hood involves the following steps:
1. Determine the mounting height: Measure the distance from the cooking surface to the bottom of the range hood. The recommended height is between 24 and 30 inches.
2. Locate the studs: Use a stud finder to locate the studs in the wall where you plan to mount the range hood. Mark the stud locations.
3. Prepare the electrical connection: Turn off the power to the range hood circuit at the main electrical panel. Install an electrical box near the desired location of the range hood and run the appropriate electrical wiring to the box.
4. Mount the range hood: Position the range hood against the wall, aligning it with the marked stud locations. Use a level to ensure it is straight. Mark the mounting hole locations on the wall. Pre-drill pilot holes at the marked locations. Secure the range hood to the wall using appropriate screws or bolts.
5. Connect the ductwork: Attach the appropriate ductwork to the range hood. The Premier Copper Products HV-EURO38S-NB-C2036BP1-TWSB model requires two 7-inch round vents for the ductwork.
6. Install the filters: Insert the slim baffle filters into the range hood. The filters should be placed in the designated filter slots.
7. Connect the wiring: Follow the manufacturer's instructions to connect the electrical wiring of the range hood to the electrical box.
8. Test the range hood: Turn on the power to the range hood circuit and test the functionality of the range hood, including the lights and fan.
For more detailed instructions and illustrations, please refer to the user guide provided with the Premier Copper Products HV-EURO38S-NB-C2036BP1-TWSB Hammered Copper Wall Mounted Euro Range Hood.
Add New Comment