Answer

Feb 21, 2025 - 10:45 PM
To install the nJoy CA0712GX-AZ Battery Cabinet for Balder, please follow these steps:
1. Rack-mount installation:
- First, fix the holders of the rack on the battery pack.
- Then, fix the battery pack on the rack through the holders.
2. Tower installation:
- Follow the provided instructions for tower installation.
3. Connecting with UPS:
- Refer to the installation chart in the manual to connect the battery pack with the Balder 1000/1500 UPS using the included cable.
4. Battery installation:
- Ensure that the battery pack is disconnected from the UPS before proceeding.
- Take the following precautions when working with batteries:
- Remove watches, rings, or other metal objects.
- Use tools with insulated handles.
- Wear rubber gloves and boots.
- Do not lay tools or metal parts on top of batteries to avoid short circuits.
- Disconnect the charging source before connecting or disconnecting battery terminals.
- Do not plug or unplug the battery connector if the UPS works in DC (discharging) mode.
- Follow the step-by-step instructions provided in the manual, including removing covers, inserting batteries, connecting battery cables, and reassembling the covers.
Please refer to the user manual for detailed illustrations and further instructions.
Add New Comment