Answer

Feb 17, 2025 - 11:04 PM
To adjust the leg positions of the MGF Wall Bridge, follow these steps:
1. Measure the thickness of the wall or panel that the leg is to be fitted to.
2. Refer to the recommended settings chart provided in the user guide.
3. Look up the configuration that suits your required thickness.
4. With the Wall Bridge at ground level, lift it using its designated lift point so it is 100mm clear of the floor and hanging freely.
5. Remove the four course adjustment bolts and place them securely for re-use later.
6. Slide the 'A' side and 'B' side legs so the arrows align vertically to the recommended setting on the chart.
7. Once aligned correctly, refit the bolts and tighten them securely.
8. Ensure the fine adjustment screws are fully undone or retracted before lifting the Wall Bridge in place. This allows for maximum gap availability to fit over the wall.
It is important to always check the tightness of the fine adjustment screws on a daily basis and inspect all components before each use.