Answer

Feb 17, 2025 - 08:20 PM
To install the LARSON ELECTRONICS LEDB-4-IR Permanent Mount, follow these steps:
1. Ensure that the installation is conducted by a qualified electrician in accordance with NEC and any relevant local building codes.
2. Before starting the installation, make sure the electrical power is turned off.
3. Verify that the supply voltage matches the fixture's rated voltage.
4. Avoid exposing the wiring to edges of sheet metal or sharp objects to prevent wiring damage or abrasion.
5. The fixture is suitable for damp locations.
6. Mount the beacon in your desired location using the 3 xxxx holes located on the base and secure it with the provided gasket.
7. Attach the power cord via the deutsch 2-pin connector.
8. Connect the power cord to a power source that outputs the correct voltage (12-32V DC).
9. Once power is supplied, the LED beacon will illuminate. If it doesn't, double-check all connections.
10. Detachable cords are available for this product. To detach the cord, depress the tab on the top of the connectors.
11. Routine cleaning and checking of the fixture for proper function is recommended. Disconnect power before cleaning the lens with a non-abrasive glass cleaning solution.
Please note that these instructions provide a general overview of the installation process. For more detailed information or specific variations, it is recommended to contact Larson Electronics directly for further assistance.
Add New Comment