Answer

Feb 17, 2025 - 03:59 AM
To install the pump hose on the RUNZE RZ01 Peristaltic Pump, follow these steps:
Step 1: Open the pump head lock downward.
Step 2: Remove the transparent pump head cover.
Step 3: Install the pump hose.
Step 4: Notice that the two ends of the pump hose are clamped on the pump head.
Step 5: Install the pump head cover and close the pump head lock upward.
Step 6: Installation is complete.
Please refer to the provided manual for visual illustrations and further instructions on the installation process.
Add New Comment