Answer

Feb 17, 2025 - 01:28 AM
To mount the Zenitel A100K11254 TCIS Turbine Compact IP Station, you can follow the instructions provided in the user manual. Here is a step-by-step guide:
1. On-Wall Surface Mounting:
- Use the included M5 fasteners, grommets, M20 cable gland, and washers for extra protection.
- Mount the back box onto the wall using A4 socket head screws.
- Fit the gasket onto the back box with the ridged side facing down.
- Plug the Ethernet cable into the RJ-45 port on the station.
- Mount the Turbine station onto the back box with the provided M5 fasteners, applying 1.5 Nm torque.
2. Flush Mounting:
- Use the Flush Mount 2-Gang Double-Depth Back Box (TA-2) and the Flush Mount Bracket (TA-5).
- Apply silicone sealant all around the aluminum frame of the station, leaving the microphone aperture open.
- Mount the 2-gang back box into the wall and mount the bracket onto the back box with #6-32 UNC pan head screws.
- Fit the gasket onto the bracket with the ridged side facing down.
- Plug the Ethernet cable into the RJ-45 port on the station.
- Mount the Turbine station onto the bracket with the provided M5 fasteners.
Please note that these instructions are a summary and it is important to refer to the user manual for complete and accurate information.
Add New Comment