Answer

Feb 15, 2025 - 03:44 AM
To prepare the site for installation of the G21 GAH 1300 Base, please follow these steps:
1. Before beginning construction, check local building codes regarding footings, location, and other requirements.
2. Remove sod and any other unevenness from the ground where the base will be installed.
3. Level the high spots using a flat shovel and tamp the construction down to ensure a level surface.
4. Gather the basic tools required for installation, including a screwdriver, pliers, work gloves, tape measure, level, and a spade or shovel.
5. Separate the contents of the carton by the part number while reviewing the parts list. Check to ensure that you have all the necessary parts for your kit.
Please refer to the provided manual for detailed instructions and illustrations on the assembly process. Remember to prioritize safety by wearing work gloves, eye protection, and long sleeves when handling the kit, as some parts may have sharp edges.
Note: The images used in the manual are for illustrational purposes only and may differ from the actual product.