Answer

Feb 15, 2025 - 02:23 AM
To assemble the Ferplast 570478 RABBIT 120 DOUBLE Two Storey Cage for Rabbits, please follow the steps outlined in the instruction manual provided with the product. Here is a general overview of the assembly process:
1. Start by unpacking all the components and ensuring that you have all the necessary parts mentioned in the manual.
2. Begin by assembling the base of the cage. Connect the four base panels together using the provided connectors or screws, following the instructions in the manual.
3. Once the base is assembled, attach the side panels to the base. Make sure they are securely connected and aligned properly.
4. Next, assemble the upper floor of the cage. Connect the panels together using the provided connectors or screws, following the instructions in the manual.
5. Attach the upper floor to the side panels of the base. Ensure that it is properly aligned and securely connected.
6. Install any additional accessories or features, such as ramps, doors, or feeding bowls, according to the instructions provided.
7. Finally, double-check all the connections and make sure everything is secure before placing your rabbits in the cage.
Please note that these are general assembly instructions, and it is important to refer to the specific instructions provided in the manual for accurate and detailed guidance.
Add New Comment