Answer

Feb 15, 2025 - 02:22 AM
To assemble the Ferplast 57047817ZP RABBIT 120 DOUBLE Two Storey Cage for Rabbits, please follow the steps below:
1. Start by unpacking all the components and ensuring that you have all the necessary parts mentioned in the instruction manual.
2. Begin by assembling the base of the cage. Connect the four base panels together using the provided connectors. Make sure they are securely attached.
3. Once the base is assembled, attach the two side panels to the base. Slide the side panels into the slots on the base and secure them using the connectors.
4. Next, attach the back panel to the base and side panels. Slide it into the slots and secure it with the connectors.
5. Now, it's time to assemble the top part of the cage. Connect the two top panels together using the provided connectors.
6. Attach the front panel to the top part of the cage. Slide it into the slots and secure it with the connectors.
7. Once the top part is assembled, place it on top of the base and align the slots on the side panels with the slots on the top part. Slide them together and secure them with the connectors.
8. Finally, attach the doors to the front panel. Insert the hinges into the designated slots and secure them with the provided screws.
9. Ensure that all the connectors are tightened properly to ensure stability and safety.
10. Once assembled, you can place the necessary accessories and bedding inside the cage for your rabbits.
Please note that this is a general overview of the assembly process. For more detailed instructions and illustrations, please refer to the Ferplast 57047817ZP RABBIT 120 DOUBLE Two Storey Cage for Rabbits Instruction Manual that came with the product.
Add New Comment