Answer

Feb 15, 2025 - 02:11 AM
To install the Go Power GP-SF-1.5 SUNfilm Solar Battery Charger, please follow these steps:
1. Choose a location: Select a location that receives direct sunlight. Placing the charger in a shaded area may greatly reduce its power output.
2. Mounting: Mount the SUNfilm to any flat surface using fasteners or self-adhesive Velcro strips (not provided). Do not drill or alter the frame in any way, as doing so will void the warranty.
3. Connection: Refer to section 4.1 of the manual for connection options. Ensure proper polarity is observed throughout the installation.
4. Important note: Avoid pulling the SUNfilm power cable, as it may cause stress on the junction box. The power cable should never support the weight of the module.
For more detailed instructions and safety precautions, please refer to the Go Power GP-SF-1.5 SUNfilm Solar Battery Charger Owner's Manual provided with the product.
Note: If you encounter any issues during installation or have further questions, you can visit the Go Power! website at www.gpelectric.com for additional product warranty information or contact their Technical Support team at 1-866-247-6527.
Add New Comment