Answer

Feb 15, 2025 - 01:28 AM
To install the APC NetShelter SX 750mm Cable Management Rings in your rack, please follow the steps below:
1. Ensure that you have all the necessary tools and equipment for installation, including a screwdriver and appropriate mounting hardware.
2. Identify the desired location for the cable management rings within your rack. It is recommended to position them near the patch panels and switches for efficient cable routing.
3. Align the cable management rings with the mounting holes on the side of the rack. The rings should be positioned vertically, allowing cables to be easily routed through them.
4. Insert the mounting screws through the holes on the rings and into the corresponding holes on the rack. Tighten the screws securely to ensure stability.
5. Repeat the above steps for each cable management ring you wish to install.
6. Once all the rings are securely mounted, you can begin routing your cables through them. Simply loop the cables through the rings, ensuring they are organized and properly managed.
Please refer to the APC NetShelter SX 750mm Cable Mgmt Rings Owner's Manual for any additional information or specific instructions related to your particular rack model.
Add New Comment