Answer
![manuals.plus](https://data3.answerbase.com/answerbase/15673/UserFiles/User3627018/profileImage3627018.jpg?638365818380000000)
Feb 11, 2025 - 02:27 AM
To assemble the SUN JOE 24V-PS10-LTE Cordless Pole Chain Saw, follow these steps:
1. Unpack the cordless pole chain saw and check that all the necessary parts are included.
2. Make sure you have heavy-duty gloves on before handling the bar and chain.
3. Unscrew the chain/sprocket end cover xxxx counterclockwise to unlock and remove the chain/sprocket end cover.
4. Remove the old chain from the guide bar.
5. Lay out the new saw chain in a loop and straighten any kinks. Make sure the sharp side of the teeth faces away from you in the direction of the chain rotation indicated on the guide bar.
6. Starting at the tip of the guide bar, mount the chain drive links into the bar groove, leaving a loop at the back of the bar.
7. Hold the chain in position on the bar and place the loop around the sprocket. Fit the bar flush against the mounting surface so that the bar stud holes are aligned with the long slot of the bar.
8. Replace the chain/sprocket end cover by positioning it onto the saw head. Fit the end cover xxxx by inserting the bar stud into the bar stud hole. Tighten the end cover xxxx , but leave the bar free to move for tension adjustment.
9. Remove all slack from the chain by turning the chain tensioner ring clockwise until the chain seats snugly against the bar with the drive links in the bar groove.
10. Raise the guide bar and tighten the end cover xxxx securely.
11. Fill the chain oil tank with bar and chain oil before using the chain saw.
12. Check that all screws on the machine and the guide bar are tightly fastened.
13. Check that the chain is tensioned correctly and there are no signs of damage.
14. Check that hand grips and protection devices are clean, dry, correctly mounted, and securely fastened to the machine.
15. Check that the On/Off switch and safety lock button move freely without forcing and return automatically and rapidly back to their neutral positions.
16. Make sure the cooling air vents are not clogged with sawdust or debris.
17. Check that the chain's oil level is not below the "MIN" level mark. If necessary, top up the oil to 1 cm from the rim of the filler.
Please refer to the SUN JOE 24V-PS10-LTE Cordless Pole Chain Saw User Manual for more detailed instructions and safety guidelines.
Add New Comment![Sending...](https://manuals.answerbase.com/images/loading-boxes.gif)