Answer

Feb 10, 2025 - 11:07 PM
To install the Artika 9FM-EUDC_BL Europa 9 LED Flush Mount Light, please follow the step-by-step installation instructions provided in the manual. Here is a summary of the installation process:
1. Before starting the installation, make sure to turn off the breaker at the panel and switch off the main electrical supply from the fuse box/circuit breaker.
2. The mounting bracket installation is the first step. Attach the mounting bracket (Item B) to the junction box using the provided retaining screws (Item C).
3. Connect the wires from the junction box to the wires of the LED ceiling light using the wire connectors (Item E). Make sure to follow the correct wiring connections for your specific electrical setup.
4. Once the wires are securely connected, carefully lift the LED ceiling light (Item F) and align it with the mounting bracket. Securely attach the LED ceiling light to the mounting bracket using the provided screws.
5. After the light is securely installed, turn on the breaker at the panel and switch on the main electrical supply.
Please note that it is recommended to have this product installed by a certified electrician, especially if it is required by the electrical and building codes in your region. Additionally, make sure to read and understand all the instructions in the manual before proceeding with the installation.
For further assistance or more detailed instructions, you can refer to the complete instruction manual provided with the product or contact Artika's customer service at 1-866-661-9606 or support@artika.com.
Add New Comment