Answer
![manuals.plus](https://data3.answerbase.com/answerbase/15673/UserFiles/User3627018/profileImage3627018.jpg?638365818380000000)
Feb 08, 2025 - 12:13 AM
To install the KaWe Wandstation MedCenter 5000 Wall Mounted Charging Station, follow these steps:
1. Hold the mounting plate horizontally on the wall and mark 3 anchor holes.
2. Drill holes with a Ø 6 mm drill to a depth of approximately 35 mm and insert the anchors.
3. Secure the mounting plate by tightening the screws with a screwdriver.
4. Place the base unit disconnected from the mains on the sheet strip, press it down, and slide it down gently until it stops.
5. Check that the base unit is securely fastened.
6. If using an add-on unit, affix it on the right side of the base unit. The add-on unit is secured by the guides of the base unit and the hinge of the end frame. Hold the add-on unit, attach the end frame, and mark the holes. Remove the add-on unit before drilling the holes.
7. Drill holes with a Ø 6 mm drill to a depth of approximately 35 mm and insert the anchors for the end frame.
8. Attach the add-on unit and end frame to the base unit as described in Step 6 and secure it with screws.
9. Secure the back panel of the end frame by tightening the screws with a screwdriver.
10. Attach the front panel to the end frame.
Please refer to the user manual for detailed illustrations and additional information on the installation process.
Add New Comment![Sending...](https://manuals.answerbase.com/images/loading-boxes.gif)