Installation and usage of the Hager VC02SW Meter Box Switch can be done by following the guidelines provided in the user manual. Here is a step-by-step guide:
1. Ensure that you have the necessary tools and equipment for installation, including appropriate cables and wiring accessories.
2. Before starting the installation, make sure to disconnect the power supply to the meter box.
3. Select a suitable location inside the meter box for installing the VC02SW switch. Ensure that there is enough space and clearance for proper operation.
4. Open the meter box cover and position the VC02SW switch in the desired location. The switch should be mounted securely using appropriate fixing screws.
5. Connect the incoming and outgoing cables to the switch terminals. The switch is designed to accommodate conductor sizes ranging from 16-35mm2. Use the twin cable clamps provided to secure the insulated and sheathed meter cables, reducing strain on the switch terminals.
6. Double-check all connections to ensure they are secure and properly tightened.
7. Once the connections are complete, close the meter box cover and secure it using the anti-tamper xxxx cap. This unique feature allows the supply authority to secure the main cover in place after installation.
8. If desired, the VC02SW switch can be locked in the open/off position using the appropriate Hager accessory for added safety and security.
For more detailed instructions and diagrams, please refer to the Hager VC02SW Meter Box Switch user manual. It provides comprehensive information on installation, usage, and safety precautions.
Note: It is always recommended to consult a qualified electrician for installation and to ensure compliance with local electrical regulations and standards.