Answer

Feb 07, 2025 - 12:07 AM
To install the Jimi IoT LL303 Solar Powered Asset Tracker, follow these steps:
1. Fix the base to the desired installation position using the provided screws.
2. Mount the device onto the base and secure them together using the provided screws.
For more detailed instructions, please refer to the "Installation" section in the user manual.
Note: It is important to ensure that the device is securely installed to prevent any tampering or damage.
Add New Comment