Answer

Feb 04, 2025 - 02:47 AM
Installation of the V-TAC LED Slim Floodlight with Direct Connection involves the following steps:
1. Switch off the power and confirm the installation position.
2. Use an impact drill to punch holes in the building surface.
3. Insert expansion bolts into the holes.
4. Fix the bracket to the building surface.
5. Turn the connector counterclockwise and pass the sorted cable through the waterproof cap and connector.
6. Connect the cable to the terminal, with the live wire connected to L, the zero wire connected to N, and the ground wire connected to the ground terminal. Tighten the xxxx of the terminal block.
7. Turn the connector and waterproof cap clockwise, ensuring that the waterproof joint nut is tightened to prevent water leakage. The rubber-covered part of the outer lead should extend into the waterproof cap for more than 15mm to avoid water leakage.
8. Switch on the power and test the light.
Please note that these are general installation instructions. For more specific details and illustrations, please refer to the installation diagram and instructions provided in the V-TAC LED Slim Floodlight with Direct Connection Installation Guide.
It is important to follow all safety precautions and, if needed, consult a qualified electrician for assistance with the installation.
For any further queries or issues with the product, you can reach out to V-TAC at support@v-tac.eu.
Add New Comment