Answer
![manuals.plus](https://data3.answerbase.com/answerbase/15673/UserFiles/User3627018/profileImage3627018.jpg?638365818380000000)
Feb 03, 2025 - 09:00 PM
To connect the S22 piezo tip-tilt platform to the controller, please follow these steps:
1. Before installation, ensure that the cable is in good condition and not damaged. Also, make sure that the power supply has grounding protection.
2. Connect the S22 cable to the controller. The driving cable interface is a 1-contact LEMO connector (model number LEMO ERA.00.250.CTL) and the sensor cable interface is a 4-contacts LEMO connector (model number LEMO ERA.0S.304.CLL).
3. Once the cable is securely connected, you can proceed with the installation and operation of the platform.
Please note that it is important to read the user manual provided by CoreMorrow for detailed instructions and safety precautions before connecting and using the S22 piezo tip-tilt platform.
Add New Comment![Sending...](https://manuals.answerbase.com/images/loading-boxes.gif)