Answer
![manuals.plus](https://data3.answerbase.com/answerbase/15673/UserFiles/User3627018/profileImage3627018.jpg?638365818380000000)
Feb 03, 2025 - 08:55 PM
To properly install the S50.UR0C/K Piezo Tilt/Rotation Stage, please follow the steps outlined in the user manual:
1. Ensure that the installation plane is relatively flat.
2. Mount the stage on the mounting surface using M6 screws and tighten them properly.
3. When mounting the load, make sure that the load quality is less than the maximum load capacity of the stage. Mount the load in the center of the moving surface for optimal positioning accuracy.
4. Connect the S50.UR0C/K connector with the corresponding controller according to the identification at the connector.
5. Tighten the load slowly when mounting it to prevent damage to the mechanism.
6. Avoid stretching and bending the cables.
7. Use the dedicated cable provided by CoreMorrow to connect the S50.UR0C/K and the controller. Do not connect via an extension cable casually. If you need a longer cable, please contact CoreMorrow.
8. Before turning on the power, ensure that the S50.UR0C/K is properly grounded, the operating environment meets the requirements, and all fixed screws are tightened.
9. Read the user manual of the controller carefully before operation and set the controller's output voltage to zero first.
10. Check for any abnormal phenomena and then input the voltage value within the specified range for the piezoelectric ceramics (0~120V, maximum 150V).
11. After use, perform a voltage reset operation.
Please refer to the user manual for more detailed instructions and illustrations. If you encounter any issues during the installation process, please contact CoreMorrow for assistance.