Answer

Jan 31, 2025 - 11:33 PM
To install and connect the GYS W5S-4L Arc Welding Machine, follow these steps:
1. Gas Coupling:
- Fit the gas pipe to the gas connector (6) of the wire feeder.
- Make sure the gas pipe is securely connected.
2. Contact Cable Connection:
- Connect the wire feeder to the generator.
- Ensure that the power connectors (8) & (11), the command connectors (7) & (12), and the water connectors (13) & (9) are securely tightened.
3. Wire Reel Installation:
- Open the door of the machine.
- Position the wire reel on the support (1) with the pin aligned.
- Adjust the break (2) to avoid reel movement when welding stops.
- Tighten the plastic xxxx firmly (3).
- Release the fixing xxxx of the wire guide (4) for the first use.
- Put the rollers in place (5) with the visible diameter matching the wire diameter used.
- Place the wire guide (6) close to the roller without touching it, then tighten the fixing xxxx .
- Adjust the drive rollers by loosening the drive roller xxxx (7), inserting the wire until it exits the other side by about 2cm, starting the motor by pressing the torch trigger, and tightening the xxxx while pressing the trigger. The setting is correct when the guide roller slides over the wire, even when it is blocked at the end of the torch.
Please refer to the GYS W5S-4L Arc Welding Machine Instruction Manual for more detailed instructions and illustrations.
Add New Comment