Answer

Jan 31, 2025 - 10:39 PM
To install the Offgridtec Remote Meter for the MPPT Pro Duo Charge Controller, you can follow these steps:
1. Wall Installation:
- Locate and drill xxxx holes based on the Frame Mounting dimension of the base, and erect the plastic expansion bolts.
- Use four PA4.2×32 self-tapping screws to fix the Frame.
- Remove the decorative shell.
- Use four M4×8 pan head screws to mount MT11 Surface on the Frame.
- Install the decorative shell.
2. Surface Mounting:
- Locate and drill xxxx holes based on the installation size of the Surface.
- Remove the decorative shell.
- Use four M4×8 cross recessed pan head screws with M4 nuts to mount MT11 Surface onto the panel.
- Install the decorative shell.
Note: Make sure to consider the plugging/unplugging space of the communication cable and the length of the cable during installation.
For more detailed instructions and illustrations, please refer to the user manual provided with the Offgridtec Remote Meter for the MPPT Pro Duo Charge Controller.
Add New Comment