To install and commission the Fronius 1 Plus 2 GEN24 Surge Protective Device, follow the steps outlined in the user guide provided. Here is a general overview of the installation process:
1. Switch off and disconnect power: Before starting the installation, make sure to switch off and disconnect the power supply to ensure safety.
2. Prepare for installation: Ensure that you have read and understood all the documents provided, including the user guide. Familiarize yourself with the wiring and mechanical characteristics of the device.
3. Wiring: Follow the wiring instructions provided in the user guide. Connect the surge protective device according to the specified guidelines. Make sure to comply with the applicable standards and regulations.
4. Mechanical installation: Install the surge protective device in a suitable location, ensuring proper mounting and grounding. The device should be protected from environmental factors such as moisture and extreme temperatures.
5. Commissioning: Once the device is properly installed, you can proceed with the commissioning process. This may involve activating the disconnection indicator and remote signaling of disconnection, as well as performing any necessary tests or checks.
Please note that the above steps are a general overview, and it is important to refer to the detailed instructions provided in the user guide for your specific model. The user guide will provide specific information on wiring diagrams, mechanical characteristics, and any additional steps required for the installation and commissioning process.
For any further information or specific questions, it is recommended to refer to the detailed user guide provided by Fronius or contact their customer support for assistance.