Answer

Jan 30, 2025 - 09:49 PM
To insert a bur into the Saeshin B135 Strong Electric Nail file, follow these steps:
1. Turn the handle of the handpiece to open the chuck.
2. Insert the bur into the front of the handpiece.
3. Lock the handpiece chuck by turning the handle.
4. Make sure to lock the chuck before use to avoid damage to the handpiece.
5. Check that the bur is not damaged and ensure it has the correct dimensions (Bur Dimension: 02.35mm).
Please refer to the "Bur Insertion" section in the user manual for more detailed instructions and illustrations.
Add New Comment