Answer
![manuals.plus](https://data3.answerbase.com/answerbase/15673/UserFiles/User3627018/profileImage3627018.jpg?638365818380000000)
Jan 30, 2025 - 03:17 AM
Installation of the GEWiSS GWJ1001A Joinon I-On Range Electric Vehicle Charging Station involves several steps. Here is a complete guide to help you with the installation process:
1. Location Selection:
- Choose a suitable location for the charging station, preferably near your parking spot and close to an electrical supply.
- Ensure that the location is well-ventilated and protected from direct exposure to rain or extreme weather conditions.
2. Electrical Supply:
- Before starting the installation, make sure you have a dedicated electrical circuit available with the appropriate voltage and amperage for the charging station.
- Consult a licensed electrician to ensure the electrical supply meets the necessary requirements.
3. Mounting the Charging Station:
- Use the provided mounting template to mark the location for the mounting bracket.
- Securely mount the bracket to the wall or suitable structure using the appropriate screws and anchors.
- Ensure the mounting bracket is level and stable.
4. Electrical Connections:
- Turn off the power supply to the designated circuit before making any electrical connections.
- Connect the power supply wires to the charging station following the wiring diagram provided in the installation manual.
- Use appropriate wire connectors and ensure all connections are secure and properly insulated.
- Double-check the connections to ensure they are correct and in accordance with local electrical codes.
5. Grounding:
- Connect the grounding wire from the charging station to a suitable grounding point as per local electrical codes.
- Ensure a proper grounding connection to prevent electrical hazards.
6. Final Checks:
- Carefully review all the connections and ensure they are secure and properly insulated.
- Verify that the power supply is turned off before proceeding.
- Perform a thorough inspection of the installation to ensure all components are properly installed and aligned.
7. Power On and Testing:
- Once the installation is complete, turn on the power supply to the designated circuit.
- Test the charging station by plugging in an electric vehicle and ensuring it starts charging.
- Monitor the charging process to ensure it operates correctly and safely.
Please note that this is a general guide, and it is crucial to refer to the specific installation instructions provided in the GEWiSS GWJ1001A Joinon I-On Range Electric Vehicle Charging Station manual. If you encounter any difficulties or have specific questions during the installation process, it is recommended to consult a licensed electrician or contact GEWiSS customer support for further assistance.
Add New Comment![Sending...](https://manuals.answerbase.com/images/loading-boxes.gif)