Answer
Jan 28, 2025 - 11:07 PM
To install the DRIJA Square Isla Professional Range Hood, follow these steps:
1. Before installation, ensure that the area is clean to avoid sucking out remaining broken wood and dust.
2. Do not share the same air ventilation tube with other appliances such as gas pipe or hot air pipe.
3. The bending of the ventilation tube should be ≥120°, parallel or above the start point, and must be connected to the outer wall.
4. After installation, make sure the extractor is level to avoid collecting grease at one end.
Here is a step-by-step installation guide:
1. Determine the installation position and fix the hanging scaffold in the correct position. Check the firmness and smoothness of the installation. The distance between the stove and the hood must be 55" (140cm).
2. Adjust the hood to the proper height, attach the brackets, and install them on the hangers.
3. Fix the inside of the chimney on a hanging scaffold. Place the chimney outside on it in the proper position and insert the hook into the holder to temporarily fix the exterior chimney.
4. Attach the exhaust air to the vent of the hood body and connect the extension tubing to the air outlet.
5. Extend the hose off the hanging scaffold and attach the bell body to the bracket.
6. After installation, make sure the extractor is level. Avoid hitting the glass.
Please refer to the provided pictures in the manual for a visual representation of the installation process.
Note: It is important to have the installation work carried out by qualified and competent personnel to ensure proper installation and avoid any damage or injury.
Add New Comment