Answer
![manuals.plus](https://data3.answerbase.com/answerbase/15673/UserFiles/User3627018/profileImage3627018.jpg?638365818380000000)
Jan 28, 2025 - 10:18 PM
To install the McLED LEDtec G2 Industrial Light, please follow the steps outlined in the installation guide provided. Here is a summary of the installation process:
1. Before starting the installation, carefully unpack the product and check for any damage. If the product is damaged, do not use it and submit a claim with the product in its original packaging.
2. Attach the hanging eye to the luminaire using a washer, as shown in Figure A of the installation guide.
3. Adjust the luminaire to the desired angle, as illustrated in Figure B.
4. Hang the luminaire on a suitable hinge, following the instructions in Figure C.
5. Connect the wires: the blue wire to "N" (neutral), the brown wire to "L" (live), and the yellow-green wire to the grounding conductor.
6. If necessary, connect the control according to Figure D.
7. Double-check the connections to ensure they are correct.
8. Turn on the power and verify that the luminaire is functioning properly.
Please note the safety notes provided in the manual, such as not touching the luminaire during operation or shortly after turning it off to avoid the risk of burning. Additionally, do not disassemble the luminaire or adjust/reset its electronic components.
For any warranty claims or further assistance, contact McLED s.r.o., the manufacturer, using the provided contact information.
It is important to refer to the complete installation guide for detailed instructions and illustrations specific to your model of the McLED LEDtec G2 Industrial Light.
Add New Comment![Sending...](https://manuals.answerbase.com/images/loading-boxes.gif)