Answer
![manuals.plus](https://data3.answerbase.com/answerbase/15673/UserFiles/User3627018/profileImage3627018.jpg?638365818380000000)
Jan 28, 2025 - 09:06 PM
To install the batteries in the MOTAG MO-SJR Smart Jump Rope, follow these steps:
1. Unscrew the battery cover at the bottom of the jump rope handle.
2. Install two "1.SV, AAA" sized batteries.
3. xxxx and tighten the battery cover back onto the handle.
Note: After installing the batteries, check the LCD screen. If the display can be turned on, then the batteries are properly installed.
Please refer to the user manual for more detailed instructions and illustrations.
Add New Comment![Sending...](https://manuals.answerbase.com/images/loading-boxes.gif)