Answer

Jan 27, 2025 - 04:05 AM
To install the Penn Lighting Associates Soffit Under cabinet LED Task Light, follow these steps:
1. Disconnect power: Before starting the installation, make sure to disconnect the power source to avoid any electrical hazards.
2. Clean the mounting surface: Use a 50/50 mixture of alcohol and water to clean the mounting surface where you plan to install the light. This will ensure proper adhesion.
3. Wood Overhead Installation: The light and switch come with mounting plates already attached. Simply remove the tape backing and press them in place on the desired location.
4. Metal Overhead Installation: If you are installing the light on a metal overhead, remove the mounting plates and attach the light and switch directly to the overhead surface.
5. Connect the power supply cord: Plug the connector on the power supply cord into the light. If you are using a larger power supply, you will also need to plug in the cord on it as well.
6. Install wire management clip: The wire management clip is pre-installed on the wire. Remove the paper backing and press it in place to secure the wire.
7. Multiple light installation: If you are using more than one light, plug the jumper cable into the ends of the lights. Plug in the power supply and turn on the lights. Use wire clips as required to secure the wire.
For more detailed instructions and illustrations, please refer to the provided manual or visit the 3M website at the link provided.
If you have any further questions or need assistance, you can contact Penn Lighting Associates at the provided phone number or visit their website for warranty information.
Add New Comment