To install the TOPGREENER TGSFS3 Combination Light Switch and 3 Speed Fan Control, follow these steps:
1. Turn off the power at the circuit breaker before starting the installation.
2. Remove the wall plate and the existing switch from the wall box.
3. Before disconnecting any wires, identify them and label them as needed.
4. Remove the wires from the existing switch.
5. Follow the wiring diagram provided in the instruction manual to connect the TGSFS3.
6. Use copper wires only, no aluminum.
7. Ensure that the wires used have a minimum rating of 75°C (167°F).
8. Once the wiring is complete, replace the wall plate.
Please note that it is recommended to have a qualified electrician perform the installation. Make sure to turn off the circuit breaker or fuse(s) and ensure that the power is off before wiring the device.
For further details and illustrations, refer to the instruction manual provided with the product.