Answer

Jan 27, 2025 - 01:33 AM
To install and connect the legrand LE11302BE Three-Phase Meter, please follow the instructions provided in the instruction manual. Here is a step-by-step guide:
1. Safety Precautions: Before starting the installation, make sure to strictly observe the safety precautions mentioned in the manual to avoid the risk of electric shock or fire.
2. Input/Output Connection: The meter requires connection on VT (Voltage Transformer). Refer to the wiring diagrams provided in the manual for the correct connection.
3. RS485 Wiring: If you need to connect the meter using RS485 communication, refer to the RS485 wiring diagram in the manual. It is recommended to use Cable Belden 9842, Belden 3106A (or equivalent) for a maximum length of 1000 m, or Category 6 cable (FTP or UTP) for a maximum length of 50 m.
4. Modbus Address: The meter may require a Modbus address for communication. Please consult the manual or the complete documentation available at www.e-catalogue.legrandgroup.com. Type "4 120 42 - 4 120 43" in the search field to access the relevant information.
5. Additional Accessories: The manual mentions that resistance is not furnished with the article. If you require any additional accessories or components, please refer to the part numbers provided (4 120 42 - 4 120 43) and consult the documentation for further details.
6. EU Declaration of Conformity: The product is accompanied by an EU Declaration of Conformity, which ensures that it meets the necessary European Union standards and regulations.
For more detailed instructions and information, please refer to the complete documentation available at the provided website or consult the legrand LE11302BE Three-Phase Meter Instruction Manual.
Add New Comment