Answer
![manuals.plus](https://data3.answerbase.com/answerbase/15673/UserFiles/User3627018/profileImage3627018.jpg?638365818380000000)
Jan 26, 2025 - 09:21 PM
To install the basIP AV-04SD Individual Entrance Panel, follow these steps:
1. Before mounting the door panel, determine the location on the wall with the specified dimensions.
2. Ensure that there is a supply of power cable, additional modules, and a local network.
3. Verify the completeness of the product by checking that all components are available.
4. Connect an Ethernet UTP CAT5 or higher cable to a network switch/router. The maximum cable length should not exceed 100 meters.
5. If there is no Power over Ethernet (PoE), connect a +12 V, 2-amp power supply.
6. You can connect any type of electromechanical or electromagnetic lock as long as the switched current does not exceed 1 Amp.
7. Mount the outdoor panel using the provided surface mounting bracket.
8. Make the necessary electrical connections using the set of wires with connectors provided.
9. Ensure that the outdoor panel is securely mounted and all connections are properly made.
10. Perform a functional test to ensure proper operation.
For more detailed instructions and illustrations, please refer to the full user manual available at www.bas-ip.com or wiki.bas-ip.com.
Add New Comment![Sending...](https://manuals.answerbase.com/images/loading-boxes.gif)