Answer

Jan 25, 2025 - 05:06 AM
To install the Paulmann 943.09 Solar LED Lamp, please follow the steps below:
1. Choose a suitable location: Select a location where the solar panel can receive direct sunlight for at least 6-8 hours per day. Ensure that there are no obstructions such as trees or buildings blocking the sunlight.
2. Mounting options: The lamp can be installed in two ways - either by using the included ground spike or by wall mounting. Choose the desired mounting option based on your preference and the available space.
3. Ground spike installation:
a. Attach the ground spike to the lamp head by aligning the holes and inserting the spike into the bottom of the lamp.
b. Push the ground spike firmly into the ground at the desired location. Make sure it is stable and secure.
4. Wall mounting installation:
a. Remove the ground spike from the lamp head by pulling it out.
b. Attach the lamp head directly to a wall or any other suitable surface using screws or other appropriate mounting hardware (not included).
5. Solar panel positioning: Ensure that the solar panel is positioned in a way that it receives maximum sunlight. Adjust the angle of the solar panel if needed to optimize solar charging.
6. Turn on the lamp: Locate the ON/OFF switch on the lamp head and switch it to the ON position. The lamp will automatically turn on at dusk and turn off at dawn.
7. Initial charging: Allow the solar panel to charge for at least 2-3 days in direct sunlight before expecting full performance. This will ensure optimal battery life and performance.
Note: For more detailed instructions and safety information, please refer to the Paulmann 943.09 Solar LED Lamp Instruction Manual provided with the product.
Add New Comment