Answer

Jan 24, 2025 - 10:45 PM
To install the DMTECH D9000 МСР Call Point, follow these steps:
1. Unpack the fire detector.
2. Remove the key from the base.
3. Insert the key into the base opening, push inward, and open the two parts of the fire detector.
4. Select the location for the installation of the fire detector according to the project drawings.
5. Install the base using suitable dowels and screws.
6. Connect the electric cables according to the diagram provided in Figure 1.
7. By default, the fire detector is designed to switch a 500Ω resistor or a current of 46mA at 24V DC. However, you can set the resistance to 1 kΩ or the current to 22mA by cutting the bridge on the board with mounting chucks (refer to Figure 2).
8. Install the cover of the upper supports onto the base and, with slight pressure, close the fire detector.
Please note that this answer is based on the information provided in the DMTECH D9000 МСР Call Point Installation Guide.