To install the STAHL 136665 Ex e Terminal Box, please follow the instructions provided in the instruction manual. Here is a step-by-step guide:
1. Determine the appropriate location for the terminal box, considering the specific requirements of your application and the applicable safety regulations for hazardous areas.
2. Ensure that the area is free from any potential sources of ignition and that the power supply is disconnected.
3. Open the terminal box by removing the captive cover screws, if applicable.
4. Prepare the cables that will be connected to the terminal box, ensuring that they are properly sized and stripped.
5. Inside the terminal box, you will find series terminals. Connect the cables to the appropriate terminals based on your specific requirements. The terminal box can accommodate series terminals up to 300 mm².
6. If desired, you can also install a flange on several enclosure sides. Refer to the manual for detailed instructions on how to do this.
7. Once all connections are made, ensure that they are secure and properly tightened.
8. Close the terminal box by placing the cover back on and tightening the captive cover screws, if applicable.
9. Double-check all connections and ensure that there are no loose or exposed wires.
10. Restore the power supply and test the functionality of the terminal box.
Please note that this is a general guide, and it is important to refer to the specific instructions provided in the instruction manual for your STAHL 136665 Ex e Terminal Box.