Answer

Jan 22, 2025 - 09:58 PM
To install the Eaton 68C6048G12 Case Circuit Breaker accessory handle mechanism, please follow the instructions provided in the "High Performance Rotary Handle - Model Series G–NG" installation instructions. These instructions will guide you through the installation process step by step, ensuring proper installation and functionality of the handle mechanism.
Here is a brief overview of the installation process:
1. Ensure that the power to the circuit breaker is turned off before starting the installation.
2. Remove the existing handle, if applicable, by following the instructions in the manual.
3. Align the new handle mechanism with the designated mounting holes on the circuit breaker.
4. Secure the handle mechanism in place using the provided screws or fasteners. Make sure to tighten them securely.
5. Verify that the handle mechanism is properly aligned and securely attached to the circuit breaker.
6. Once the handle mechanism is installed, you can test its functionality by operating the circuit breaker using the new handle.
For more detailed instructions and illustrations, please refer to the "High Performance Rotary Handle - Model Series G–NG" installation instructions included in the manual.
Add New Comment