Answer
Jan 21, 2025 - 03:39 AM
To install the ELCO Lighting R5H 5 Inch Steel Housing in a ceiling plenum with 2x8 joists or taller, follow these steps:
1. Ensure that the housing adjusts in the frame to accommodate the ceiling thickness, which can be up to 1 1/4".
2. Use the pre-installed hanger bars with True Nail to facilitate easy installation. These hanger bars are suitable for regular lumber, engineered lumber, and laminated beams.
3. If you are using T-grids, the housing has integral T-bar slots for easy installation. Position the housing accordingly.
4. The hanger bars can span up to 24" and can be repositioned 90° as needed. Score lines on the hanger bars allow for tool-free size reduction.
5. Align the housing with the joists using the integral leveling flange. This flange allows for single-person installation.
6. Once the housing is properly positioned, secure it by nailing the hanger bars to the joists.
Please refer to the installation sheet provided with the product for more detailed information and illustrations on the installation process.