To connect the power input to the Antaira LNP-0702G-SFP-24 Series switch, follow these steps:
1. Insert the positive and negative wires into the PWR1 (V1+, V1-) and PWR2 (V2+, V2-) contacts on the terminal block connector. Make sure to match the correct polarity.
2. Tighten the wire-clamp screws to secure the wires in place.
Please refer to Figure 1 in the installation guide for visual guidance on the power input wiring.
It is recommended to use a UL listed industrial power supply for the power source. Ensure that the power supply voltage is within the specified range of DC 12 to 36V.
Note: Always exercise caution when working with electrical connections. If you are unsure or uncomfortable with the process, it is advisable to seek assistance from a qualified professional.