To install the Danfoss AB-QM DN 40-100 Pressure Independent Control Valves, please follow the steps outlined in the installation guide provided by Danfoss. Here is a general overview of the installation process:
1. Shut off: Before starting the installation, make sure to shut off the water supply to the system.
2. Setting: Determine the desired flow rate for your application. The flow rates for different valve settings are provided in the table above. Choose the appropriate setting based on your requirements.
3. Resetting: If you need to change the flow rate after installation, you can reset the valve by turning it to the fully closed position and then back to the desired setting.
4. Locking: Once you have set the desired flow rate, you can lock the valve in place to prevent accidental adjustments. Refer to the manual for instructions on how to lock the valve.
5. Measuring: The table above provides flow rates in different units (L/h, L/s, GPM) for different valve settings. Use this information to measure and verify the flow rate of the valve.
Please note that this is a general overview and it is important to refer to the specific installation guide provided by Danfoss for detailed instructions and any additional steps or considerations specific to your installation.