To properly raise and lower a load using the Genie Superlift Contractor SLC-18 Lift and Jack, follow these steps:
1. Center the load on the load handling attachment.
- Refer to the Load Capacity Charts section to ensure the load is within the machine's capacity.
- Make sure the load is properly secured to the load handling attachment.
2. Raise the load by firmly grasping the winch handles and rotating them toward the mast.
- Ensure that the cable winds evenly onto the drum and does not wind unevenly.
- Avoid jerky or sudden movements while raising the load.
3. Lower the load by firmly grasping the winch handles and rotating them away from the mast.
- Lower the load to the desired position.
- After reaching the desired position, turn the winch handles toward the mast (raise the load) 1/4 turn to set the brake.
It is important to always follow the safety instructions and guidelines provided in the operator's manual. Ensure that the load is within the machine's capacity and properly secured before raising or lowering.