Answer
Jan 16, 2025 - 04:37 AM
To install the Smeg PU75ES Stainless Steel 28 Inch Gas Cooktop, please follow the steps below:
1. Ensure that the cut-out dimensions in your countertop are 478-482mm (width) x 555-560mm (depth).
2. Make sure the gas supply is turned off before starting the installation process.
3. Place the cooktop into the cut-out in the countertop, ensuring it fits securely.
4. Connect the gas supply line to the cooktop using a flexible gas hose. Make sure to use a qualified professional for this step to ensure proper installation and safety.
5. Once the gas supply line is connected, check for any gas leaks using a soapy water solution. Apply the solution to the connections and look for any bubbles. If bubbles appear, there is a gas leak, and you should immediately turn off the gas supply and contact a professional for assistance.
6. Connect the cooktop to an electrical outlet using the provided power cord. Ensure that the voltage matches the specifications mentioned in the manual (120V, 60Hz).
7. Once the installation is complete, turn on the gas supply and check for proper ignition and burner operation.
Please note that these instructions are a general guide, and it is always recommended to refer to the specific installation instructions provided in the product manual for your safety and to ensure proper installation.
Add New Comment