Answer
Jan 15, 2025 - 08:25 PM
To install the Midea DSK70035-J Instant Electric Water Heater, follow these steps:
1. Check the capacity of the power circuit to ensure it is sufficient for the water heater.
2. Install the power cord by connecting it to the terminal block in the water heater. Ensure proper connection and grounding.
3. Install an external circuit breaker for protection of the electric circuit.
4. Check the connection tightness of all internal electric contacts and fix any loose connections.
5. Connect the electric cable to the 220V AC power supply using a circuit breaker with proper grounding.
6. Install the enclosure of the water heater and tighten the mounting screws.
7. Switch on the 220V AC power supply and check the operability of the water heater.
For detailed instructions and diagrams, please refer to the "Power Cord Installation" and "Water Heater Installation" sections in the instruction manual.
Note: It is recommended to consult a qualified technician or engineer for installation to ensure proper and safe installation of the water heater.
Add New Comment