Answer
Jan 15, 2025 - 04:10 AM
To install the Sun System RS 1850 LED 6 Rail Foldable LED Fixture, follow these steps:
1. Switch off the mains power before starting the installation.
2. Install the 3-Point Mounting Safety Wire provided with the fixture to ensure proper support.
3. Hang the fixture level using the supplied mounting wires.
4. Ensure that the power cords are not concealed or extended through building structures, located above suspended ceilings, permanently affixed to the building structure, or subject to strain or physical damage.
5. Connect the Wieland RST 20i3 female connector on the power cord to the Wieland RST20i3 male connector on the LED fixture.
6. Connect the power cord to the mains power.
7. Switch on the mains power.
Please note that the installation should be carried out by certified service personnel in accordance with local laws and regulations. Ensure that the local cabling can support the voltage and current requirements of the fixture. Avoid coiled cords and keep mains leads separated to prevent electromagnetic interference. Do not connect or disconnect the power cable under load.
For more detailed instructions and safety precautions, please refer to the Sun System RS 1850 LED 6 Rail Foldable LED Fixture Instruction Manual.
Add New Comment